Correct way to install metal-polyurethane bushings (with 2 flanges) (Manual #15)

1

A – Make chamfer
B – Surfaces to be covered with grease
C – Press
D – New polyurethane insert (the first)
E – Control arm
F – Auxiliary bushing

2

3

A – Surfaces to be covered with grease
B – Press
C – Rotate the element
D – Auxiliary bushing

4

5

A – Surfaces to be covered with grease
B – Press
C – Metal inner bushing
D – Auxiliary bushing

It is important that the auxiliary bushing is wider than the flange, but at the same time rests firmly on the control arm.

6

Bushing correctly installed

Manual shown above is just a presentation showing how the repair procedure can be made. TEDGUM® company does not bear responsibility for any errors in the manual and incorrect interpretation of the manual. Repair should be preceded by skilled personnel with the use of appropriate tools and with keeping all the safety means. All rights reserved.

More in this category

Do you want to be informed? Subscribe to our newsletter !