1

Socket with old insert. It must be removed to allow the new one to be pressed in.

2

We cut out the old rubber to enable further operations.

3

Correctly cut rubber.

4

We make a cut on the inner part of the bushing sitting in the socket in two places opposite each other. Be careful not to cut into the socket.

5

We push the old outer bushing out of the socket.

6

We clean the socket of remains.

7

A properly cleaned socket for pressing in a new insert.

8

Applying graphite grease to the inner surface of the socket and the outer surface of the new TEDGUM® insert.

9

Pressing the new insert into the tie socket.

A – Press
B – Tie arm
C – New insert
D – Auxiliary bushing
E – Washer

10

Press the insert in until the insert collar rests on the tie socket.

11

Correctly pressed insert.

12

We spread the Seeger ring with pliers to allow the tie to be installed on the ball joint.

13

We install the tie with a new insert on the ball joint.

14

Correctly installed tie.

Share on facebook
Share on twitter
Share on linkedin
Share on email
Share on print

More in this category

News February 2024

In February, new products are very diverse, we introduced 57 new items to our offer, including both rubber and polyurethane elements, as

Więcej »

Do you want to be informed? Subscribe to our newsletter !

We would like the use of our website to be comfortable for all users. This is possible thanks to the storage of cookies in the user’s browser and the processing of anonymous data for statistical purposes by TEDGUM Tadeusz Wojciechowski, based in Ruda Śląska 41-708, ul. Zabrzańska 22 and its Trusted Partners. Our Privacy Policy contains all information regarding the method and scope of data processing. The user may at any time ask for sharing and changing the data stored by the website administrator.